Banca de DEFESA: ANDREZZA VAGNIELLY COUTINHO GERMANO

Uma banca de DEFESA de MESTRADO foi cadastrada pelo programa.
DISCENTE : ANDREZZA VAGNIELLY COUTINHO GERMANO
DATA : 28/03/2018
HORA: 14:00
LOCAL: POP/RN (localizado no Centro de Convivência da UFRN)
TÍTULO:

Making-do waste prevention method in construction sites.


PALAVRAS-CHAVES:

Waste, making-do, rework, unfinished work, lean construction.


PÁGINAS: 140
GRANDE ÁREA: Engenharias
ÁREA: Engenharia Civil
SUBÁREA: Construção Civil
RESUMO:

 

Lean construction is a production philosophy that seeks to reduce or eliminate wastes in
construction processes. Making-do is a category of waste related to the occurrence of
improvisations by the work teams. Rework consists of a new execution of a task that
has already been executed. Unfinished work refers to the non-completion of the tasks.
The study of wastes in construction is of fundamental importance in improving the
performance of construction processes as well as in cost reduction. There are important
cause and effect relationships between the categories of making-do, rework, and
unfinished work that are often related to failures in management systems that have not
prevented the spread of wastes. Thus, the main objective is to propose a method of
preventing wastes of the type making-do, rework and unfinished work in construction
sites. To do so, the research approach is called Design Science Research composed of
five phases: (1) "Problem awareness" in which the knowledge gap was obtained; (2)
"Suggestion" of the prevention method; (3) "Development" of the second version of the
method, where the refinement of the first version of the method occurred. (4)
"Evaluation" consisted in evaluating the practical utility of the second version of the
artifact through the focus group with professionals from one of the three companies
studied, in this sense some of these assessments were incorporated in the last version of
the method; (5) "Conclusion" in this last phase was identified the practical and
theoretical contributions. The results obtained in case study 1 and 2 indicated that most
of the wastes by making-do were materials / components and the impacts are rework,
unfinished work and decrease of productivity. In the case study 3, the informal packages
caused by unfinished work are mostly masonry of sealing and internal coating and were
the most increase of deadlines and costs had. The main contributions of this study are
related to the understanding of the wastes from a systemic perspective from its origin to
the impacts on the production system, as well as to make the management systems more
robust and to seek the reduction or elimination of wastes in a more effective way.


MEMBROS DA BANCA:
Presidente - 2315606 - REYMARD SAVIO SAMPAIO DE MELO
Interno - 1149445 - LUIZ ALESSANDRO PINHEIRO DA CAMARA DE QUEIROZ
Externo à Instituição - DEBORA DE GOIS SANTOS - UFS
Notícia cadastrada em: 26/03/2018 09:02
SIGAA | Superintendência de Tecnologia da Informação - (84) 3342 2210 | Copyright © 2006-2024 - UFRN - sigaa13-producao.info.ufrn.br.sigaa13-producao